-
*juanone 289 carbuild 23
http://www.uniquecobra.com/uploaded/.../wheels_01.jpg
Finally the Dayton Wire Wheels are on. They are awesome. The car is still up on jacks and waiting for the engine plumbing that Rick is doing this weekend. Then minor items that need to be dealt with such as wiring, adjustments to the shifter, battery box installation and fuel tank filler pipe installation.
Shortly we will be ready for engine start up. I have been gone for a while and have not taken any pictures because not much had been done but here shortly we will be having the car off the jacks and out of the garage and ready for first drive.
http://www.uniquecobra.com/uploaded/.../wheels_02.jpg
Here is a look at the shifter Rick installed. Note access panel on the left of the tunnel for access to the shifter for adjustments if necessary. This will be covered by a metal panel with screws and covered with carpeting.
http://www.uniquecobra.com/uploaded/...shifter_01.jpg
Juan
Juan Lopez-Bonilla
Kentucky Cobra Club
2432 Crittenden Drive
Suite 201
Louisville, KY 40217
502-635-5711
juanlb@lbrllc.net
http://www.kentuckycobraclub.com
-
Wow!! really amazing! Great look Juan and Rick.
Ralph
-
[^][^][^]
Phil
427 Roadster, #4279436
Southern Automotive FE
3:31 and Toploader
Roseville (N.Cal)
-
Looks GREAT !! I love the clean look.
Eric
-
Juan I bet those wheels really come to life out in the sun with all that detail.
Very nice!
Brent
427 SC Chassis #4279401
Candy Apple Red/White
402 FE/Toploader/3.54
-
Juan--beautiful, can,t wait to see it by ours. Will-alabama
-
hi juan, it looks really great. hey, what is that little cut-out on the driver 's side of the transmission tunnel? rdgs, jim o.
Jim O.
Unique 427 S/C #4279479
SA 402FE,Toploader,
3.53 Posi
-
Hi JimO:
The cutout is for access to the shifter for adjustments if necessary. It will be covered with a metal panel wrapped with carpet.
Juan
Juan Lopez-Bonilla
Kentucky Cobra Club
2432 Crittenden Drive
Suite 201
Louisville, KY 40217
502-635-5711
juanlb@lbrllc.net
http://www.kentuckycobraclub.com