Results 1 to 8 of 8

Thread: juanone 289 carbuild 23

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #1

    *juanone 289 carbuild 23



    Finally the Dayton Wire Wheels are on. They are awesome. The car is still up on jacks and waiting for the engine plumbing that Rick is doing this weekend. Then minor items that need to be dealt with such as wiring, adjustments to the shifter, battery box installation and fuel tank filler pipe installation.

    Shortly we will be ready for engine start up. I have been gone for a while and have not taken any pictures because not much had been done but here shortly we will be having the car off the jacks and out of the garage and ready for first drive.



    Here is a look at the shifter Rick installed. Note access panel on the left of the tunnel for access to the shifter for adjustments if necessary. This will be covered by a metal panel with screws and covered with carpeting.


    Juan

    Juan Lopez-Bonilla
    Kentucky Cobra Club
    2432 Crittenden Drive
    Suite 201
    Louisville, KY 40217
    502-635-5711
    juanlb@lbrllc.net

    http://www.kentuckycobraclub.com
    Last edited by juanone; May 16th, 2006 at 08:43 AM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •